Boston University, Center for Computing & Data Sciences rooftop garden walk

Photo by Studio Sustena

Role
  • Green Roof Designer
Client
Boston University
Location
Boston, MA
Architect
KPMB Architects
Completion
2023 · Completed
Scope of services
Design documentation & construction administration

Enhancing the student experience

The Center for Computing and Data Sciences’ award-winning, LEED-Platinum building is the largest fossil-fuel-free building in Boston. The 19 story building features green roofs on eight levels, offering students, faculty, and staff ample outdoor access. The green roofs also provide biophilic views that are designed to reduce stress and enhance academic outcomes.

Boston Univ Center For Computing Data Sciences

The roofs contain 59 species of live plants and bulbs, plus countless more established by seed. We deployed our Resilient Planting Design Tool for this project in order to maximize biodiversity and pair species by ecological function. The result is resilient landscapes that are better suited to survive disturbance, adapt, and thrive.

Project team

  • ArchitectKPMB Architects

More resiliencethan ever before.

Bring landscape architecture and civil engineering together from the start.

Contact us